Sign In | Join Free | My chinacsw.com
China Shaanxi FORUS Petroleum Machinery Equipment Co., Ltd logo
Shaanxi FORUS Petroleum Machinery Equipment Co., Ltd
Keep promises,quality assurance!
Verified Supplier

4 Years

Home > Drilling Casing Pipe >

Double Layer Mud Scraper Drilling Casing Pipe

Shaanxi FORUS Petroleum Machinery Equipment Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Double Layer Mud Scraper Drilling Casing Pipe

  • 1
  • 2

Brand Name : FORUS

Model Number : 6 5/8"

Certification : ISO

Place of Origin : China

MOQ : 30 Pieces

Payment Terms : L/C, T/T, Western Union

Delivery Time : 30 days

Packaging Details : Wooden Box

Product Name : Double-Layer Mud Scraper

Size : 2 -3/8" to 6-5/8"

Material : Rubber

Application : Oil Drilling

Contact Now

Drilling Casing Pipe Double-Layer Mud Scraper Size 6 5/8"

Introduction of double-layer mud scraper


Name and specification model: drill pipe mud scraper 2.3 inches, 2.7 inches, 3.5 inches, 4 inches, 4.5 inches, 5 inches, 5.5 inches, 6 5/8 inches, 2

7/8 inches, etc. 3. Performance/technical parameters/ Working principle: using RSS3, JSR, SBR raw materials. It has the characteristics of wear

resistance and mud erosion resistance. The operating temperature is -30℃-120℃, and it is installed under the drilling pan. During tripping, the

mud and oil stains on the surface of the drill pipe are scraped off, which is conducive to the collection of mud and prevents the sundries on the

drilling floor from falling into the wellhead.


Features


The double-layer mud scraper produced by our company is a disc structure. There are 4 overflow grooves symmetrically opened along the

circumferential side wall of the mud scraper body. The 4 overflow grooves are all connected to the hollow cavity in the mud scraper body. The

bottom surface of the mud scraper body is also provided with an overflow hole, and the overflow hole is communicated with the hollow cavity in

the mud scraper body.


The overall thickness of the mud scraper produced by our company is 75mm, and the thickness of the first layer and the second layer are both

25mm.


Double-layer mud scraper installation method


The mud scraper is installed under the drill disk and quickly installed on the drill pipe by rotating, which is convenient, safe, fast and has a long

service life.


Oil Drill Pipe Scraper


Working principle: The mud scraper on the outer wall of the drill pipe mainly adopts the slide way to centralize the mud scraper, so that the mud

scraper slides along the slide way. Under the action of the double-acting cylinder and the spring, the mud scraper is tightly attached to the annular

outer wall of the drill pipe lifted upward from the well. The mud scraper scrapes off the drilling fluid on the outer wall of the drill pipe lifted upwards

, so that the outer wall of the drill pipe column lifted out is clean, and there is no drilling fluid to pollute the environment.


A detailed description


Material: This product uses excellent wear-resistant nitrile rubber as the basic material, and there is a skeleton inside to prevent deformation.


Main application: It can prevent the drilling fluid from returning from the well, and remove the drilling fluid from the inner wall of the drill pipe to

prevent corrosion of metals.


Hardness: HS(Shore A)=85±5


Tensile strength: ≥18.0MPa


Operating temperature: -60 ℃ to 120 ℃


Specifications


2 3/8", 2 7/8", 3", 3 1/2", 4", 4 1/2", 5", 5 1/2", 6 5/8".

Double Layer Mud Scraper Drilling Casing Pipe


Product Tags:

2 -3/8" Drilling Casing Pipe

      

6-5/8" Drilling Casing Pipe

      

Double Layer mud scraper

      
Quality Double Layer Mud Scraper Drilling Casing Pipe for sale

Double Layer Mud Scraper Drilling Casing Pipe Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shaanxi FORUS Petroleum Machinery Equipment Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0